Skip to main content

The Future is Here.

Secure. Sustainable. Scalable. Supported.

Gigawatt-scale renewable energy powering hyperscale data infrastructure

A next-generation clean-energy and AI-infrastructure precinct delivered through a landmark partnership with the Karajarri People, providing firm renewable power and scalable data-centre capacity for sustainable economic growth.

Global power demand from data centres is soaring

Traditional grid infrastructure is increasingly constrained. Large-scale, dedicated renewable energy precincts represent a necessary evolution in power delivery for compute-intensive operations.

IEA Projection by 2030

1,000 TWh

Data-centre electricity consumption is projected to approach 1,000 TWh annually, representing 180–220 GW of continuous load.

BloombergNEF Forecast by 2050

3,700+ TWh

Long-term forecasts indicate growth to over 3,700 TWh, exceeding 750 GW of sustained demand.

Project Overview

A scalable, off-grid AI and clean-energy hub addressing the fundamental constraints of hyperscale expansion:
Power Availability, Land Access, and Grid Capacity

Initial Phase

240 MW

With target for 48 MW RFS (Ready for Service) 2030.

Expansion Pathway

1 GW+

IT load capacity scalable to multi-gigawatt renewable generation across 275 km² development zone.

Firm Renewable Power

24/7 Supply

1+ gigawatt capacity using solar, wind and long-duration storage for dedicated, firmed power independent of grid constraints.

Secured Site

30,000+ km²

Indigenous Land Use Agreement with the Karajarri People provides land certainty and streamlined access across exceptional renewable resource area.

Strategic Connectivity

~50 ms to Singapore

Redundant fibre routes provide low-latency pathways to Singapore, APAC, Pilbara and other domestic markets.

Infrastructure Ready

Integrated

Logistics access via ports, roads and airports with modular development approach for rapid deployment.

Optimised for AI

PUE ~ 1.3

Closed-loop liquid cooling and efficiency-optimised design supporting high-density compute for hyperscalers and AI training.

ESG Leadership

Co-designed

Partnership with Traditional Owners delivers long-term employment, training pathways, and culturally informed development.

Key Project Metrics

1 GW+


Data Centre IT Load


(48MW – RFS 2030)

275 km2


Development Area


(of 30,000 km2 ILUA)

~ 7 GW


Solar PV + Wind


(Gas-firmed)

Tier III


99.999% availability


N+1 resilience

~ 50 ms


to Singapore


low-latency to APAC

82 – 99%+


Renewables


(solar + wind + bess + ldes)

PUE ~1.3


Closed-loop direct


liquid-to-chip cooling

> 45%


Power cost savings


from target markets

Strategic Location

Scalable Land Access & Enabling Infrastructure

Gingerah Energy

A secure, sustainable and scalable renewable energy hub.

Gingerah Energy Hub

Renewable Energy Resources

Concentrated Solar

Solar PV

Wind Energy

Connect with Us

Learn more about this landmark opportunity